Payment terms and shipping on a first garment order
Deposit splits for trial and repeat orders, the currency and transfer method, and which shipping term is quoted — with the reasoning behind each.
Payment terms are where a first order is won or lost, and the structure is simpler than the number of clauses suggests. Here is what to expect, and why the split looks the way it does.
Trial orders: 50 / 50
For a first, smaller order the usual structure is 50% in advance and 50% before shipment. The deposit covers what has to be paid for up front — fabric, trims, labels, the sample rounds — and the balance is due when the goods are finished and ready to leave.
Repeat orders: 30 / 70
Once a relationship is established, regular orders normally run 30% deposit with the balance against the bill of lading. The smaller deposit reflects the fact that the supplier now knows the buyer, and the balance is still tied to shipping documents rather than to goodwill.
Currency and transfer
Quotes are issued in USD or RMB, and payment is by bank transfer (T/T). Agreeing the currency early avoids a re-quote when the exchange rate moves between the sample and the bulk order.
Shipping terms
The quoted trade term is FOB Ningbo or Shanghai. In practice this means:
- The price covers the goods delivered to the port, with export clearance handled.
- Sea freight, insurance and destination charges are arranged by you, usually through your own forwarder.
- You choose the port at the quotation stage; both are routinely used.
FOB is a starting point, not a rule. If your forwarder prefers to collect from the factory, or if you need the goods consolidated with other suppliers, say so when you request the quote rather than after it is issued.
What to settle before the first order
- Currency — USD or RMB, agreed up front.
- Port — Ningbo or Shanghai, and whether you use your own forwarder.
- The payment split — confirm 50/50 for the trial order so the invoice and the contract match.
- What the price includes — garment, packing, carton marks; anything extra (special packaging, extra labels, hangtags) is quoted with the project.
What is not published here
Pricing is per project: fabric, construction, quantity and packaging move it more than anything else, so a published price range would be misleading. Send the style and the per-color quantities through the RFQ and the quote comes back with the terms above attached.
Want a quote with terms attached? Use the RFQ form — quantity per color is the field that changes the answer most. The production process explains what happens between deposit and shipment.