Garment production
Material coordination, cutting, sewing, finishing, packing and quality control.
Production starts from the approved sample and does not improvise from there. Materials are confirmed against what was approved, quality is checked on the line and again before packing, and the reference for every check is the sample you signed off.
Scope
Everything below sits inside this service rather than being sold as a separate product.
Process
The approved pre-production sample is the reference for the whole order. Changes after approval affect both quality control and the delivery date.
Bulk fabric and trims are booked against the approved standard, and bulk color is checked against the approved lab dip.
You receive
The pre-production sample is made from bulk materials and approved by you before cutting begins.
You receive
Panels are cut to the approved pattern and marker.
You receive
Garments are assembled to the approved construction, with checks while the line runs rather than only at the end.
You receive
Thread trimming, pressing and finishing are carried out, with measurement and appearance checked against the approved sample.
You receive
Every piece is inspected before packing, and a third-party inspection can be arranged in place of or alongside ours.
You receive
Garments are packed to your specification and prepared for shipment.
You receive
Reference timings
These are estimates, not guarantees. Fabric, construction, revision rounds, approval speed and scheduling all move the date.
Decision points
Most delays come from these four, not from the work itself.
Stock fabric can vary in shade between dye lots. We raise this before bulk so an acceptable tolerance is agreed, instead of discovering it at inspection.
The approved pre-production sample defines measurements, construction and finish. A change after approval is a new decision with a schedule effect.
Tell us early whether you will inspect yourself, send a third party, or ship directly. It changes the packing and handover sequence.
Packing method, carton marking and shipping terms are confirmed per order before finishing begins.
Buyer questions
Our own QC team inspects every piece, and an independent QC group sits separately from the sewing line. You can also inspect the goods yourself, appoint a third-party inspection company, or ship directly. Third-party inspection is accepted.
Inspection is full rather than sampling-based, with AQL Major 2.5 and Minor 4.0 applied to the defect classification. Checks cover measurements, workmanship, color consistency, print and embroidery placement, pressing and finishing, trims and packing method.
About 30–45 days when the fabric is available, and about 40–60 days when the fabric has to be produced. Peak season and special techniques can extend this, so we confirm the date for your order.
No. We have our own factory and also work with long-term partner factories. Which one runs a project depends on the style, construction, capacity and delivery date. Our own team handles development, material coordination, finishing and quality management across both.
Start with the project details
Share the product type, estimated quantity, target date and your tech pack if available. We will review the project before discussing the next step.