How to prepare a garment RFQ that gets a useful response
The quantities, files and decisions a development team needs to assess your style accurately — and what happens after you press send.
A supplier can only answer as precisely as the information they are given. Most enquiries that stall do not stall because the request was unusual — they stall because one of five things is missing. Here is what each one changes, so you can decide what to send now and what can wait.
1. Product type and target market
“Womenswear” covers everything from a cotton poplin shirt to a lined blazer, and those are different factories, different machines and different timelines.
Say what the garment is and where it will be sold. A summer shirt for a northern European brand and a structured officewear blazer for a warmer market will be developed differently even at the same quantity.
2. Quantity per style and per color
This is the number that decides whether a project is viable, and it needs to be split, not totalled. A 600-piece order in one color and a 600-piece order split across six colors are not the same job: fabric has to be dyed or cut in different lots, and trims and labels are ordered per variant.
For reference, our standard minimum is 300 pieces per style per color. Projects around 100 pieces per style per color can be reviewed depending on fabric, construction and cost, and quantities around 50 are exceptional and assessed case by case. Sending the real split lets that assessment happen in the first reply rather than the third.
3. A tech pack, a size chart — or a reference sample
A tech pack is the fastest route: patterns, construction and measurements can be checked before anything is cut. A size chart plus a clear written description works too.
If you have neither, you are not stuck. Send a reference sample: we can develop patterns and samples from a physical garment, which is how many brands start with a new supplier.
4. Fabric, color and artwork direction
Tell us what is already decided and what is still open:
- Fabric: composition and weight if known. If not, the garment’s use and season is enough to start sourcing.
- Color: a Pantone reference, or a physical swatch if the color is critical.
- Print or embroidery: artwork or a placement description.
This matters because fabric availability drives the calendar. A stock fabric can move straight to sampling; a custom fabric has its own production time of roughly 15–45 days before garment work begins.
5. Target season or delivery date
A date turns a wish list into a plan. Working back from it, we can tell you whether the sample rounds fit, and whether a custom fabric is realistic or whether you should choose from stock.
A sample takes about 10 days when a suitable fabric is available, and a salesman sample about 20 days. Bulk production is roughly 30–45 days after all details are confirmed, or 40–60 days when the fabric itself has to be produced.
What happens after you send it
We review the project before replying, so the answer tells you something:
- Whether the style fits the categories we develop and produce.
- Which quantity and timing are realistic for it.
- What is missing before sampling can start.
If we are not the right partner for a style, we say so — a fast no is more useful than a slow maybe.
Ready to send yours? The RFQ form asks for exactly the five things above. If you would rather talk it through first, start a WhatsApp conversation or look at the development process in more detail.