Third-party inspection: what it covers and when to book it
How an inspection fits into a production run, what the AQL levels mean, and the point in the calendar when an inspector should be on site.
Many European brands make a third-party inspection a condition of the order. It is a reasonable thing to want, and it works better when it is planned into the calendar rather than added at the end.
Third-party inspection is accepted here, and buyers who already work with an inspection company are welcome to use it.
What our own checks cover
Before any external inspection, the goods have already been through our process:
- 100% of pieces are inspected before packing, not sampled — workmanship, measurements and finishing on every garment.
- Defects are judged against AQL Major 2.5 / Minor 4.0.
- The quality team is independent of the production line — the people who check the goods do not report to the people who made them.
An external inspection therefore sits on top of a full check rather than replacing it.
What an inspection typically verifies
- Measurements against the approved size chart, measured on the packed goods.
- Workmanship — seams, stitching, symmetry, trims, cleanliness.
- Packing — quantity per carton, carton marks, polybag and hangtag setup.
- Labelling — main label, care label, country of origin, and the artwork you approved.
- Color and fabric against the approved standard and lab dip.
Give the inspector your approved sample, size chart and packing specification. An inspection against vague criteria produces a report nobody can act on.
When to book it
The useful moment is after packing and before shipment: at that point the goods are in their final state, the cartons are closed, and a problem can still be fixed without missing the shipping window.
Booking earlier — while goods are still on the line — is possible and sometimes worthwhile for a first order, but it cannot replace the final check.
If the report raises an issue
The report is the start of a conversation, not an automatic rejection. Minor findings are usually handled by repairing or replacing the affected pieces; anything that changes the delivery date is flagged immediately rather than discovered at the port.
Need inspection included in a project? Mention it in the RFQ form — booking it early is cheaper than booking it late. The factory and quality page explains how checking is organized.