From tech pack to first sample: what happens in between

Pattern review, fabric decisions, construction and fit comments — the steps between sending your pack and holding a sample you can approve.

You send a tech pack. Some time later a sample arrives. For most brands the middle is a black box, which makes it hard to know what to prepare and what to expect. Here is the actual sequence, and where projects usually lose a week.

Step 1 — Pattern review

The pack is read before anything is cut: construction, seam types, measurements and the way the garment is meant to sit. Where a size chart or reference sample was sent instead of a full pack, the pattern is drafted from that.

This is the cheapest place to catch a contradiction — for example a measurement that only works with a different seam allowance. Catching it here costs a message. Catching it after the sample costs a sample round.

Step 2 — Fabric and trims

If you specified a fabric, availability is confirmed and a swatch or hanger sample is checked against the pack. If the fabric has to be developed or dyed to a Pantone reference, a lab dip is prepared and approved before cutting: dyeing is one of the few steps where the physical result can differ from the screen.

This is also when trims are decided — main label, care label, hangtag, packaging — since they change the sample’s construction and the bulk order.

Timing note: a stock fabric can move straight to cutting. A custom fabric adds its own production time of roughly 15–45 days before the sample can start.

Step 3 — Sample construction

The sample is cut and sewn, and the details in the pack are followed rather than interpreted: stitch type, finishing, spacing, hardware. This is the stage where “about 10 days” applies — when a suitable fabric is on hand.

Step 4 — Fit comments, then revisions

The sample is measured against the spec and sent to you. Your fit comments come back — usually as adjustments to length, ease, armhole, collar or drape.

The normal pattern allows for two to three sample rounds: a first (or fit) sample, one revision sample, and the pre-production sample. Each round is a chance to change something; each extra round beyond the agreed set adds time and is charged at twice the sample price, which is why sending consolidated comments in one pass keeps a calendar intact.

Step 5 — Pre-production sample

When the fit and construction are approved, the pre-production sample is made in the final fabric with the final trims. Once you approve it, bulk production is scheduled — typically about 30–45 days after all details are confirmed.

What to prepare before the sample starts

  • Measurements or a size chart you are confident in; if in doubt, send a reference garment and say the parts you want kept.
  • Fabric direction, or a clear brief if it is open.
  • Label and packaging artwork if you have it; if not, decide before bulk, not before the sample.
  • One person on your side who can give consolidated comments — this is the single biggest lever on how many rounds a project needs.

Starting a style? Send the pack through the RFQ form, see the sampling and fit process in full, or read how fabric and color decisions affect the calendar.

Start with the project details

Ready to discuss your next style?

Share the product type, estimated quantity, target date and your tech pack if available. We will review the project before discussing the next step.