From tech pack to first sample: what happens in between
Pattern review, fabric decisions, construction and fit comments — the steps between sending your pack and holding a sample you can approve.
You send a tech pack. Some time later a sample arrives. For most brands the middle is a black box, which makes it hard to know what to prepare and what to expect. Here is the actual sequence, and where projects usually lose a week.
Step 1 — Pattern review
The pack is read before anything is cut: construction, seam types, measurements and the way the garment is meant to sit. Where a size chart or reference sample was sent instead of a full pack, the pattern is drafted from that.
This is the cheapest place to catch a contradiction — for example a measurement that only works with a different seam allowance. Catching it here costs a message. Catching it after the sample costs a sample round.
Step 2 — Fabric and trims
If you specified a fabric, availability is confirmed and a swatch or hanger sample is checked against the pack. If the fabric has to be developed or dyed to a Pantone reference, a lab dip is prepared and approved before cutting: dyeing is one of the few steps where the physical result can differ from the screen.
This is also when trims are decided — main label, care label, hangtag, packaging — since they change the sample’s construction and the bulk order.
Timing note: a stock fabric can move straight to cutting. A custom fabric adds its own production time of roughly 15–45 days before the sample can start.
Step 3 — Sample construction
The sample is cut and sewn, and the details in the pack are followed rather than interpreted: stitch type, finishing, spacing, hardware. This is the stage where “about 10 days” applies — when a suitable fabric is on hand.
Step 4 — Fit comments, then revisions
The sample is measured against the spec and sent to you. Your fit comments come back — usually as adjustments to length, ease, armhole, collar or drape.
The normal pattern allows for two to three sample rounds: a first (or fit) sample, one revision sample, and the pre-production sample. Each round is a chance to change something; each extra round beyond the agreed set adds time and is charged at twice the sample price, which is why sending consolidated comments in one pass keeps a calendar intact.
Step 5 — Pre-production sample
When the fit and construction are approved, the pre-production sample is made in the final fabric with the final trims. Once you approve it, bulk production is scheduled — typically about 30–45 days after all details are confirmed.
What to prepare before the sample starts
- Measurements or a size chart you are confident in; if in doubt, send a reference garment and say the parts you want kept.
- Fabric direction, or a clear brief if it is open.
- Label and packaging artwork if you have it; if not, decide before bulk, not before the sample.
- One person on your side who can give consolidated comments — this is the single biggest lever on how many rounds a project needs.
Starting a style? Send the pack through the RFQ form, see the sampling and fit process in full, or read how fabric and color decisions affect the calendar.