What actually moves the price of a garment order
The four levers — fabric, construction, quantity and packing — that decide a woven-shirt quote, and how to plan a first order that can be repeated at a better price.
Two shirts can look almost identical and quote far apart. The difference is not markup — it is four variables, and most of them are decided before the first sample is cut. Understanding them is how you keep a first order affordable and a second one cheaper.
1. Fabric
Fabric is almost always the largest single line. A stock fabric carries no mill minimum and can move straight to sampling; a custom fabric — your composition, weight or color — has its own minimum at the mill and roughly 15–45 days of production time before garment work begins.
The price gap between the two is real, but so is the calendar gap. For a first order, stock fabric is the single biggest lever on both cost and timing.
2. Construction and decoration
Standard construction in a known silhouette quotes differently from a style with unusual seam work, lining or custom trims. Decoration — print or embroidery — is developed per project, and the technique, the number of placements and the artwork size all move the price.
Trims are the quiet variable: a stock button costs a fraction of a custom-branded one, and custom labels, hangtags and packaging are quoted with the project rather than assumed.
3. Quantity — counted per style, per color
The minimum is 300 pieces per style per color, and the price follows the same counting rule. Six colors at 100 pieces is six small runs, not one 600-piece order: cutting, dyeing lots, trims and quality checking all scale with the number of variants, not with the total.
This is why consolidating colorways is usually the cheapest design decision a first order can make.
4. Packing
Polybag, carton, carton marks and any retail-ready packaging are part of the quote. Plain export packing is the baseline; retail packaging, custom labels and special cartons are priced with the project.
Where sampling fits
Sampling is charged before bulk: the first development sample is paid, and an extra revision round beyond the agreed set (a first sample, one revision and the pre-production sample) costs twice the sample price. Once a style has run to bulk, samples for that style are normally not charged. A sample is still the cheapest insurance in the process — it catches fit and construction questions while they are a sample-sized expense rather than a bulk-sized one.
What is not published
A price list. The spread between a basic cotton poplin shirt and a structured officewear piece is wide enough that a published range would mislead more than it helps — quotes come back per project, with the terms attached.
Planning a repeatable first order
- Start with stock fabric; move to custom once the style is proven.
- Consolidate colorways around the 300-per-color minimum.
- Keep trims standard for the first run; introduce custom labels when the style repeats.
- Plan the second order with the first: repeating a proven style in the same fabric and color is where unit price usually gets better.
Want a project priced? The RFQ form needs the product type, the per-color quantities and your target timing — those three change the answer most. The MOQ and fabric minimums guide goes deeper on the quantity rules, and payment and shipping terms explain what the quote arrives with.