Sourcing

Sourcing Woven Shirts for German Collections: What to Prepare and How to Plan the Calendar

A preparation guide for brand teams planning German collections — what to send a woven-shirt supplier, the quantities that quote cleanly, and how sampling and production windows fit a calendar.

Sourcing a woven shirt collection from China is mostly a preparation problem. The suppliers, the fabrics and the production capacity exist; what decides whether a collection lands on time is how early the product decisions travel and how completely they are written down. This guide is written for brand teams planning German collections, and it covers the two things that matter most before a first order: what to prepare, and how to plan the calendar around real sampling and production windows.

What to prepare before you contact a supplier

A supplier can only quote and plan against what you can describe. The strongest briefs we receive carry:

  • The product — a tech pack, or a reference garment plus a measurements table. Construction details (collar, cuff, placket, hem) belong in writing, because they change both the sample and the price.
  • The size chart you intend to sell — grading follows it, so it needs to be decided before sampling, not after.
  • Fabric and color direction — a composition or weight direction and any Pantone references; if a print or embroidery is part of the design, its artwork and placement.
  • Quantities per style and per color, even approximate, and your target delivery date.
  • Branding elements — labels, care labels, hangtags and packaging, or the artwork for them.

Our guide to preparing a garment RFQ lists this in the order that makes an enquiry easy to assess; the current shirt developments show the level of detail we work from.

Quantities: the part that affects both price and calendar

Woven shirt minimums are counted per style, per color — not against a total order. Our standard minimum is 300 pieces per style per color, and quantities around 100 pieces per style per color can be reviewed case by case, depending on fabric, construction and the target price.

For planning, the practical consequence is that colorways behave like separate small orders: cutting, fabric lots, trims and quality checking all scale with the number of variants. An early decision to consolidate colors usually buys calendar time as well as cost.

Planning the calendar backwards

Work from the delivery date back through the stages, using the windows we publish:

Stage Window
Sample with a suitable stock fabric About 10 days
Fabric produced or dyed to your color (if custom) Roughly 15–45 days before garment work begins
Bulk production About 30–45 days after details are confirmed; about 40–60 days when the fabric itself has to be produced

Two notes that decide whether the plan survives:

  • The fabric path is the biggest calendar lever. Stock fabric removes the mill minimum and the fabric production window; custom fabric adds both. For a first collection against a hard delivery date, starting from stock and moving to custom once the style is proven is the lower-risk route.
  • Approval speed is a calendar input. Fit comments collected in one round, from one decision-maker, keep a development inside its sample window. The sample-to-approval path is described in from tech pack to first sample, and the cost drivers behind changes are covered in what moves a garment quote.

Peak season and special techniques can extend the windows above, so the date for a specific order is confirmed with the quote rather than assumed.

Quality planning goes in the same calendar

Inspection has its own lead time on the calendar. Our process is full inspection — every piece checked before packing, with defects classified against AQL Major 2.5 / Minor 4.0 — and an independent QC group sits separately from the sewing line. If your team plans a third-party inspection, book it with the order, not after bulk finishes; the third-party inspection guide covers what inspectors check and when to schedule them. The factory and quality page describes the full standard.

The commercial terms to plan for

  • Payment by T/T, quoted in USD or RMB: 30% deposit with the balance against the bill of lading on regular orders, 50/50 on smaller trial orders.
  • Goods ship FOB Ningbo or Shanghai; sea freight scheduling is confirmed with the order.
  • Payment and shipping terms explains each element and the reasoning behind the structure.

On certification and testing: Certification and testing requirements differ by brand and market. Tell us which standard or test report your order needs, including BSCI, OEKO-TEX Standard 100, GOTS or ISO 9001, and we will confirm what applies and what documentation we can provide before you commit.

Working rhythm

Our working hours are Monday to Friday, 9:00–18:00 Beijing time, and we reply to enquiries within 24 hours. For approvals, the practical rhythm is simple: send fit comments and decisions early in your working day, and the answer comes back within ours — which keeps the sample and production windows aligned with the plan above.

Planning a German collection? Send the product type, quantities per style and color, and your target delivery date through the RFQ form — we will come back with feasibility, material direction and a calendar that matches. The development and production pages describe what each service includes, and the custom women’s woven shirts page collects the terms buyers ask for first.

Start with the project details

Ready to discuss your next style?

Share the product type, estimated quantity, target date and your tech pack if available. We will review the project before discussing the next step.